Skip to content

Fort Myers

Contact us
ChampionRoofing

Fort Myers · Cape Coral · Lee County

Roofs built forthe storm seasonthat follows.

From a leak assessment to a replacement roof, start with the condition of your property. Discuss materials, underlayment, ventilation and the work needed before agreeing a project scope.

  • Fort Myers & Lee County
  • Roof repair & replacement
  • Ask about availability
A newly completed architectural shingle roof on a Southwest Florida home
Roof repair enquiriesRoof replacement planningShingle, metal & tile optionsFort Myers & Lee CountyRequest a property assessmentDiscuss warranty termsProject scope agreed before work

Start here

What are you
actually seeing?

Pick the thing you noticed. You will get what it usually means, how fast it needs dealing with, and roughly what it costs — before you speak to anyone.

A brown ring on the ceiling

Water is already through the deck and sitting in the insulation. The stain is downhill of the actual entry point, often by several feet.

Assessment and pricing confirmed by the team

Not sure which it is? Send two photos from your phone and we will tell you.

Get it looked at

Four systems

Every roof has
a trade-off.

Anyone can list what a material is good at. The useful half of that conversation is what it costs you — so each of these carries the honest catch underneath the strengths.

Shingle, standing seam metal, clay tile, membrane and roofing nails laid out side by side
New architectural asphalt shingle roof on a Fort Myers home

Architectural Shingle

20–25 years

Rated to 130 mph, 150 with enhanced nailing

The default across Lee County, and for good reason — it is the cheapest compliant roof you can put on a house here, it repairs in patches, and insurers understand it without an argument.

  • Six nails per shingle, not four — the enhanced pattern the wind rating depends on
  • Peel-and-stick underlayment across the whole deck, not just the valleys
  • Ring-shank re-nail of the deck to current code before anything goes down

It is the shortest-lived system on this page. Twenty years is a realistic Southwest Florida life, and UV plus salt will take the top off that if the attic ventilation is wrong.

$480–$760/ square

Shingle in detail
Standing seam metal roof on a Southwest Florida coastal home

Standing Seam Metal

40–50 years

Rated to 160–180 mph depending on panel and clip

Concealed-fastener panels with clips that let the metal move. It is the system that survives a named storm best, and increasingly the one insurers will actually write a policy against without a fight.

  • Concealed clips — no exposed screws, so no gasket to fail in eight years
  • Aluminium rather than steel within a few miles of the Gulf
  • Panels roll-formed to length on site, so no end laps to leak

Two to three times the cost of shingle up front, and a dented panel is a panel replacement rather than a patch. It pays back over decades, not years.

$1,150–$1,850/ square

Metal in detail
Terracotta barrel tile roof on a Mediterranean style Florida home

Concrete & Clay Tile

40–50 years

Rated to 150+ mph when foam-set to current approval

What half of the tile roofs in this county actually need is not new tile — it is the underlayment beneath it replaced. Tile outlives the membrane under it by decades, and that membrane is the roof.

  • Existing tile carefully lifted, stacked and re-laid where it is sound
  • New self-adhered underlayment — the layer that was actually leaking
  • Foam-set or mechanically fastened to the current Florida product approval

Heavy, and not every older structure was framed for it. Walking a tile roof breaks tile, so routine work costs more than it does on shingle.

$1,050–$1,900/ square

Tile in detail
White TPO membrane flat roof on a Florida commercial building

Flat & Low-Slope

20–30 years

Rated by assembly — fully adhered systems test highest

TPO, modified bitumen and silicone restoration for commercial buildings, lanai and porch roofs, and the flat sections almost every Florida ranch house has hiding behind a parapet.

  • Heat-welded seams, probe-tested along their length before we leave
  • Tapered insulation where the deck ponds, rather than more coating over a puddle
  • Every penetration flashed with a proper boot, not a bucket of mastic

Low slope is unforgiving of detail. Ninety per cent of flat-roof failures are at a penetration or a termination bar, which is why we price those properly instead of trimming them.

$700–$1,300/ square

Flat / TPO in detail

Inside a roof

Six layers.
Five you will never see again.

Once the covering is on, nobody can check the deck was re-nailed or whether the membrane runs across the whole field. That is exactly why those are the parts a cheap quote leaves out. Tap a layer.

123456

Secondary water barrier

A peel-and-stick membrane bonded to the whole deck. When wind takes the covering off in a named storm, this is the layer standing between the weather and your ceiling.

What gets skipped

Cheap quotes use 30lb felt or run peel-and-stick only in the valleys. It is invisible from the ground and it is the single biggest corner cut in Florida roofing.

We photograph the parts you cannot check

Self-adhered underlayment being rolled across bare plywood decking

Membrane across the whole field

Day 1, before covering

A nail gun setting ring-shank nails along a chalk line on roof decking

Ring-shank re-nail at 6in

Day 1, photographed

Vented aluminium soffit and drip edge at the eave of a Florida home

Soffit intake opened up

The half of ventilation people forget

What it costs

Real numbers,
before you call anyone.

Pick your rough home size. These are illustrative planning estimates including tear-off, permit and disposal — the band is wide because pitch, layers and deck condition genuinely move it.

Architectural Shingle

20–25 years

$12,480 – $19,760

About $806 per year of service life

Standing Seam Metal

40–50 years

$29,900 – $48,100

About $975 per year of service life

Concrete & Clay Tile

40–50 years

$27,300 – $49,400

About $959 per year of service life

Flat & Low-Slope

20–30 years

$18,200 – $33,800

About $1,300 per year of service life

A budgeting guide, not a quote. Steep pitch, a second layer of old roof, rotten decking or awkward access all move the number, so confirm assessment fees and the written scope with the team. The per year of life column is the one worth reading twice.

Get the real number

June to November

Four steps to
plan your roof work.

Start with the condition of your roof and an agreed scope. Confirm assessment availability, project requirements and any insurance questions before committing to work.

Assess

Start with the condition

Describe visible damage and request a property assessment. The appropriate scope depends on the roof and structure.

Plan

Agree the project scope

Discuss materials, installation details, permit requirements and the expected schedule before work begins.

Check

Contact your insurer

Ask your insurer about your policy, documentation and applicable deadlines. Coverage is not guaranteed by a roofing enquiry.

Confirm

Availability and pricing

The team must confirm visit availability and provide a project quote. An online enquiry is not a confirmed appointment.

Roof open right now?

Keep clear of unsafe areas and contact emergency services for immediate danger. Enquire about roof assessment availability.

Contact us

Insurance

Six steps, and
the order matters.

Most of the money people lose on a storm claim is lost in the first forty-eight hours, before a contractor is even involved. This is what to do, in sequence.

Read this once

If anyone offers to waive or absorb your deductible, walk away.

It is insurance fraud and in Florida it is a felony for the contractor and for you. The crews offering it after a storm are the crews that will not answer the phone in eighteen months.

Storm & hurricane work
  1. 1

    Document what you can safely see

    Keep photographs and notes without climbing onto a damaged roof or entering unsafe areas.

  2. 2

    Contact your insurer

    Ask about coverage, reporting requirements and applicable deadlines directly with your insurer.

  3. 3

    Request a roof assessment

    Share the property address and visible concerns so the team can discuss an appropriate assessment.

  4. 4

    Agree any temporary work

    Confirm the scope, price and availability of temporary protection before authorising work.

  5. 5

    Review the written scope

    Discuss materials, exclusions, permits and payment terms. Any insurance decision remains with your insurer.

  6. 6

    Keep your project records

    Retain the agreed scope, invoices and any inspection or completion documents supplied for the work.

Champion Roofing's foreman on a Fort Myers job site

Our own crews

Confirm the project team, scope and schedule before work begins.

Our standards

Eight things you can
hold a tape to.

Every roofer says quality workmanship. None of it is checkable. These are, and you are welcome to go up the ladder and look on the day.

Peel-and-stick over the whole deck

Not felt, and not peel-and-stick in the valleys with felt everywhere else. It is the layer that saves your ceiling when a storm takes the covering.

Six nails, hand-checked

The enhanced pattern the wind rating actually depends on, and a foreman who pulls shingles at random to check the crew is hitting the nailing line.

Deck re-nailed and documented

8d ring-shank at six inches on centre, photographed before it is covered. It is a code requirement and a mitigation credit, and we prove we did it.

Every penetration is new

Boots, vents, valley metal and step flashing all replaced. Reusing old flashing is the reason a new roof leaks in year two.

Ventilation calculated, not guessed

Ridge exhaust balanced against soffit intake for your actual attic volume. Unbalanced ventilation cooks a shingle roof from underneath.

Wind mitigation form included

Completed and handed over with the paperwork. On a lot of Lee County policies it pays for a slice of the roof by itself.

Magnet sweep, twice

Once at the end of tear-off and again before we pull off site. Nails in a driveway are the thing homeowners remember about a roofer.

Project coordination

Confirm materials, installation responsibilities and applicable warranty terms in the written scope.

Discuss your project

Confirm the scope, availability and project requirements with the team before work begins.

Lee & Charlotte County

Five building departments,
five different queues.

Cape Coral, Fort Myers Beach, Sanibel, Charlotte County and unincorporated Lee all run their own permitting. Which one you are in moves your start date more than anything about the roof.

Also covering: Alva & Buckingham · Babcock Ranch — and outside those borders, call anyway. The line on a map and the line on our schedule are rarely the same.

Straight answers

The questions
we get every week.

Nothing hidden behind a click. If yours is not here, call and ask — we would rather spend ten minutes on it now than have you find out on install day.

How do I request an assessment?

Use the enquiry form with your contact details, property address and a description of the work. A request is not a confirmed appointment.

Can I choose an appointment time?

Share your preferred day and time. Availability and the final appointment must be confirmed by the team.

How is the price agreed?

The scope and property conditions affect the quote. Confirm the written price, any call-out fee and payment terms before work begins.

What should I prepare?

Describe the issue and share any access restrictions or useful property information. Ask the team about preparation before a visit.

What credentials and warranties apply?

Ask for the current credentials, insurance documentation and written warranty terms relevant to your job before agreeing to work.

Still not sure what you need? Ask about an assessment and the next steps.

Contact us

Request an assessment

Get it looked at.
Plan the next step.

Describe the property and the work you are considering. The team will need to confirm the assessment, scope, costs and appointment availability.

Your details are used to respond to this enquiry. Read our privacy notice above.

A roof inspector photographing findings on a Fort Myers roof

Roofing enquiries

Contact us

Yard

5038 Westminster Dr
Fort Myers, FL 33919

Hours

Visits by appointment
Availability confirmed by the team
Contact the team about availability

Enquire Request an assessment