Skip to content

Fort Myers

Contact us
ChampionRoofing
All services

Architectural Shingle Roofing

The most roof per dollar in Lee County — provided the parts nobody sees are done right.

From
$480 / square
Life
20–25 years here
Wind
130–150 mph rated
On site
2 days typical
New architectural asphalt shingle roof detail with ridge cap
Roof repair enquiriesRoof replacement planningShingle, metal & tile optionsFort Myers & Lee CountyRequest a property assessmentDiscuss warranty termsProject scope agreed before work

Architectural shingle is what goes on most of Lee County, and the reason is straightforward: it is the cheapest assembly that meets current code, insurers price it without argument, and a damaged slope can be patched rather than replaced.

What decides whether you get twelve years or twenty-two out of it is nailing and ventilation. Six nails per shingle instead of four is what the higher wind rating actually depends on, and it costs a few dollars a square. Attic ventilation is the other half — an unbalanced attic in Fort Myers runs hot enough all summer to cook the asphalt out of the shingle from the underside, and no warranty covers that.

We install with the enhanced six-nail pattern as standard, we calculate ridge exhaust against actual soffit intake rather than assuming, and the foreman pulls shingles at random during the day to check the crew is hitting the nail line. That last one sounds petty. It is the single most common installation defect in the trade.

What is in the price

Six-nail enhanced pattern

Standard on every roof, spot-checked by the foreman during install.

Peel-and-stick across the deck

Full-field self-adhered underlayment, not felt with membrane in the valleys.

Starter strip and ridge cap

Purpose-made components, not cut-up field shingles, which is what fails first at the edges.

Ventilation balanced to the attic

Ridge exhaust sized against real soffit intake, with intake opened up where it has been painted or blocked shut.

Algae-resistant shingle as standard

Copper-granule AR shingle — the streaking on Florida roofs is algae, and it is avoidable.

Manufacturer warranty registered

Registered in your name, with the paperwork emailed rather than left on a truck seat.

How it runs

  1. 1

    Survey and colour

    Measure, photograph, and leave physical samples. Shingle colour reads very differently in Florida sun than on a brochure.

  2. 2

    Permit

    Filed with the product approval for the exact shingle and underlayment specified. One to two weeks in the county queue.

  3. 3

    Tear-off, re-nail, dry-in

    Day one. Deck photographed before it is covered so you can see what you paid for.

  4. 4

    Cover, vent, sweep

    Day two, then magnet sweeps and the paperwork pack including the mitigation form.

Questions on this one

How long does a shingle roof really last in Fort Myers?

Twenty to twenty-five years with correct ventilation, closer to fifteen without it. The manufacturer's thirty or fifty-year figure is a prorated material warranty measured under test conditions, not a service life in Southwest Florida sun.

Which brand do you use?

Discuss the proposed work and request the relevant credentials and documentation before agreeing to the project.

Does shingle colour affect cooling costs?

A little. A lighter or reflective granule will drop attic temperature a few degrees, which is real but smaller than what correct ventilation and insulation do. If cooling cost is the priority, metal is the honest answer, not a lighter shingle.

Request an assessment

Get it looked at.
Plan the next step.

Describe the property and the work you are considering. The team will need to confirm the assessment, scope, costs and appointment availability.

Your details are used to respond to this enquiry. Read our privacy notice above.

A roof inspector photographing findings on a Fort Myers roof

Roofing enquiries

Contact us

Yard

5038 Westminster Dr
Fort Myers, FL 33919

Hours

Visits by appointment
Availability confirmed by the team
Contact the team about availability

Enquire Request an assessment